    PCC Line-2 Lighting & Arrester Installation And Heating Ventilation Air Conditioning Installation

    Hits: 2605
    PCC Line-2 Lighting & Arrester Installation And Heating Ventilation Air Conditioning Installation

    Client :  PT. Sinarmas Specialty Minerals

    Project Location: Perawang, Riau – Indonesia

    Technical and engineering support to do electrical installation including :

    - Cable Tray Installation

    - Install Flexible Conduit/Pipe Galvanis/Metal/Conduit

    - Install Panel

    - Metal Fabrication Work

    - Pulling Cable

    - Lighting Installtion For Indoor and Outdoor

    -Lightning Arrester Installing

    -Grounding Piling & Looping Installtion

    Technical and engineering support to do HVAC installation including :

    - AC Split 1-2PK Installation

    - AC Split type floor standing Installation

    - AC Split Capacity 20PK Installation

    - Ducting Installation

    - Ventilator & Exhaus fan Installation