
Client : PT. ABB Sakti
Project Location : Perawang – Indonesia
Technical and engineering support to do electrical installation including :
- 5 MVA transformer installation positioning and terminations
- Panel drives installation
- Whole cable pulling and terminations work for control cable,
signal cable, fiber optic, LV, MV and HV power cable.
- Ladder system supply, design and installation