Motor drives and control system at PPM 6 factory Pulp and Paper industry

    Hits: 3195

    Client :   PT. ABB Sakti

    Project Location :  Perawang – Indonesia

     

    Technical and engineering support to do electrical installation including : 

    - 5 MVA transformer installation positioning and terminations

    - Panel drives installation

    - Whole cable pulling and terminations work for control cable,

       signal cable, fiber optic, LV, MV and HV power cable.

    - Ladder system supply, design and installation